thomas schlarb
Member
We are installing new communications wiring in duplex units that are 100 years old and do not have any fire rated assemblies in them. The cabling is going from the basement/crawlspace through the second floor into the attic. Is it required by code that the chase that the wires and conduit are being run in be fire stopped at the first floor, first floor ceiling and attic ceiling?