I have a question about first point of disconnect.
Residential application. High end development ( not relevant) meter and 2 200 amp main disconnects at property
line the 2 sets of service wires 3+ grnd run underground to house, about 60 feet +-. enters home and then goes to 2, 200 amp panels. We installed a generator and put the transfer switches (2) inside between the panels and wire coming from the mcb outside. Neutrals and grounds already separated in panels and we separated as well in trnsf. switch. Inspector says that the transfer switch is now first point of disc and we must drive new rods and run cold water ground to trnsf. sw.
Just trying to make heads or tales of this. cannot seem to find code section addressing it. Any thoughts?
Residential application. High end development ( not relevant) meter and 2 200 amp main disconnects at property
line the 2 sets of service wires 3+ grnd run underground to house, about 60 feet +-. enters home and then goes to 2, 200 amp panels. We installed a generator and put the transfer switches (2) inside between the panels and wire coming from the mcb outside. Neutrals and grounds already separated in panels and we separated as well in trnsf. switch. Inspector says that the transfer switch is now first point of disc and we must drive new rods and run cold water ground to trnsf. sw.
Just trying to make heads or tales of this. cannot seem to find code section addressing it. Any thoughts?