Does anybody have any tips for fishing romex behind the standered two and three quarter inch baseboard trim. Used only for a last resort if there is know attic or basement access.
Just remove the baseboard, remove the sheetrock, drill out the studs and re-install everything, the baseboard seems pretty short though, most of the houses I do have 5 1/2" baseboard... alot easier to work with.
In some of the older houses, I found when I removed the 1/4 round there was enough cavity between the hardwood and the plaster that I could run Romex there safely.