M mstrlucky74 Senior Member Location NJ Jan 15, 2017 #1 Do you guys prefer to get your 2x2,2x4's pretailed and/or prelamped? I would imagine if anything just pretailed? Why or why not? Thank
Do you guys prefer to get your 2x2,2x4's pretailed and/or prelamped? I would imagine if anything just pretailed? Why or why not? Thank
peter d Senior Member Location New England Jan 15, 2017 #2 We always use MC cable so there is no point to putting fixture whips on.
augie47 Moderator Staff member Location Tennessee Occupation State Electrical Inspector (Retired) Jan 15, 2017 #3 most of the jobs I inspect where there are a significant number of fixtures have been with pre-wired and pre-lamped.
most of the jobs I inspect where there are a significant number of fixtures have been with pre-wired and pre-lamped.
infinity Moderator Staff member Location New Jersey Occupation Journeyman Electrician Jan 15, 2017 #4 Definitely pre-lamped and pre-tailed. 20 years ago you might be booted from the job for ordering them that way. :blink:
Definitely pre-lamped and pre-tailed. 20 years ago you might be booted from the job for ordering them that way. :blink: