I Installed 4x4 metal boxes with single gang flat mod rings on the surface a concrete wall, installation didn't pass the electrical rough inspection, because the flat mod rings, any advise on this? inspector didn't like the flat mod ring because it gonna be behind the drywall!, now I think on use extension boxes after the drywall installation to meet the code and install the receptacles.
I got this in mind. 1 ship the concrete wall and reinstall all the boxes with the required mod rings or 2 use extension boxes. please help.