I am replacing an all aluminum wiring to copper in a manufactured house (mobile home). I installed a new 100 amp panel in a different location, the old one was installed in the bedroom closet, and the new location, approved by the AHJ, is in the hall way, but I need to navigate the railing under and I was wondering, I never used those, if there is a flex conduit that I can use, it has to be large enough, maybe 1 1/4 or larger and if there is one, how long is allowed as I need at least 6' before changing to buried conduit. Thanks