I don't think C.E. Is approved by the NEC or OSHA?
Based on the NEC, I would have always considered this to be an NEC violation even if it was approved by a NRTL. It would be hard to enforce the codes if this equipment was allowed but other installations were in violation that were installing with flexible cable in a similar fashion but we're not part of some equipment. Am I wrong in thinking this way or is there some other logic I can use to clarify why an electrican cannot install equipment in this fashion but an equipment manufacturer can?
Thanks for the help!