We installed a lighting track system that is suspended in an open area by aircraft cable approx 16? down from the upper structure.
The power feed is a SJ cable that drops from the ceiling to the live end of the track.
We feel that this is a proper installation under section 2008NEC 400.7A(9) that allows flexible cord for the connection of moving parts.
This type of installation is even sold by most manufacturers as a kit.
The AHJ is stating that because this is a permanent installation it has to be fed from MC not SJ cable.
We agree that the lighting track is not a luminaire
We do not think this is the intent of the code. Are we correct in this matter?
The power feed is a SJ cable that drops from the ceiling to the live end of the track.
We feel that this is a proper installation under section 2008NEC 400.7A(9) that allows flexible cord for the connection of moving parts.
This type of installation is even sold by most manufacturers as a kit.
The AHJ is stating that because this is a permanent installation it has to be fed from MC not SJ cable.
We agree that the lighting track is not a luminaire
We do not think this is the intent of the code. Are we correct in this matter?