If you has to make floor opening for vertical bus duct what's the best way to make slab opening. Chop or saw? No biggie...just curious. :dunce::thumbsup:
If you has to make floor opening for vertical bus duct what's the best way to make slab opening. Chop or saw? No biggie...just curious. :dunce::thumbsup:
Thanks!!! Could have rebar, right?We would saw cut and then chop. If it's metal Q-deck (vs. poured concrete) then torch the decking out after the concrete is removed.
Thanks!!! Could have rebar, right?
Rebar would not be the worst. Radiant heating or structural tension cables would both be really bad.
You could always have the floor x-rayed to be sure
You exclude all cutting, coring and patching and leave it to the GC.
You just mark out the hole and let them do it.
If you are just bidding the job....do this.
Always exclude this type of work imo.
If you are the prime contractor responsible for the cutting....hire/get quote a concrete coring/sawing contractor.
Too much liability for you to do this
If you has to make floor opening for vertical bus duct what's the best way to make slab opening. Chop or saw? No biggie...just curious. :dunce::thumbsup:
If you has to make floor opening for vertical bus duct what's the best way to make slab opening. Chop or saw? No biggie...just curious. :dunce::thumbsup:
If you are bidding this don't forget to include the curb that is required by 368.10(C)(2) if the busway penetrates more than one floor.