Senior Member
- Location
- NJ
- Occupation
- Estimator
I have some distribution that is being run overhead on poles. It is a desing build and my engineer( who is not here now) specified 4/0 Al cable to be run free air. Can that be run exposed/free air overhead? Thanks.