Hey all,
We have a scenario where we want to do our interconnection inside a trough located below the building's service disconnect. Due to odd layout of equipment/conduit the trough would end up containing: 1. PV Service Conductors 2. Building Service Conductors 3. The fused feeders from the loadside of the buildings disconnect. So a set of fused feeders in the same trough as un-fused service conductors Think there is anyway we can justify that or no? Thanks for any thoughts...
We have a scenario where we want to do our interconnection inside a trough located below the building's service disconnect. Due to odd layout of equipment/conduit the trough would end up containing: 1. PV Service Conductors 2. Building Service Conductors 3. The fused feeders from the loadside of the buildings disconnect. So a set of fused feeders in the same trough as un-fused service conductors Think there is anyway we can justify that or no? Thanks for any thoughts...