ggunn
PE (Electrical), NABCEP certified
- Location
- Austin, TX, USA
- Occupation
- Consulting Electrical Engineer - Photovoltaic Systems
I haven't had to deal with this in a while, but IIRC at some point the NEC changed from requiring fuses on both + and - DC conductors to just one or the other. Does anyone in here remember what code cycle that was, if indeed I do RC?