Howdy,
For an outdoor switchboard (cable/conduit entry from the bottom), how does one allow for circuits to be installed on day-2? An indoor switchboard (usually) can have day-2 conduits or cables enter from the top or side, but an outdoor switchboard doesn't have this luxury. I'd imagine you'd have to install spare conduits day-1 or some sort of trench. Any experience/ideas?
Thanks!
For an outdoor switchboard (cable/conduit entry from the bottom), how does one allow for circuits to be installed on day-2? An indoor switchboard (usually) can have day-2 conduits or cables enter from the top or side, but an outdoor switchboard doesn't have this luxury. I'd imagine you'd have to install spare conduits day-1 or some sort of trench. Any experience/ideas?