Bear with me please. I have a 400 amp single phase service drop. Below the meter there is a trough with taps coming off the load side conductors which go to (3) 60A disconnects on the building exterior which go to roof top units. Also coming out of the trough are (3) 3/0 conductors which feed a 200A main breaker panel directly inside the building. As of now the only GEC I can find is a #4 copper wire that is connected to the trough and to a driven ground. My question is where do I land the 1/0 GEC that I am bringing from the water supply inside the building? Thanks