Survey says...
Survey says...
The buiding dept. has helped me out greatly, though it took four hours for them to return the call. I believe that only the area near the gas pumps (and all wiring from there to the panel) must be explosion-proof. I haven't seen explosion-proof wiring in the repair areas. But I'm in California.