Barndog
Senior Member
- Location
- Spring Creek Pa
I have a single phase 4 wire sub feed run out to my garage. while having my septic pumped out the neutral wire was cut. I was wondering if is a violation to remove the neutral on both sides and move ground wire to neutral buss. I have a ground rod connected to panel. I don't know if that's ok to do. Is there any other options I have rather than digging back up and repairing the wire. thanks I don't have a code book on me to reference and do mostly maintenance electrical work.