Got a contract last week on a job I bid last year, then re-bid a month ago because it was over budget. I was told the re-bid was even more (my price went up), but the county decided to go ahead with it realizing the price is never coming down.
I asked for specs with the ITB, was told there were none. It’s a community center; wood framed, hard ceilings. I bid it with all NM cable and plastic boxes, and noted that in my proposal.
My fixture and gear submittals came back with a revise and resubmit stamp, and three pages worth of items they wanted submittals on. I called the PM this afternoon and asked if he was certain there wasn’t a specification binder. He said “oh yeh I forgot, there is one, the plumber and mechanical guys called today too asking about it.”
The specs called for the job to be hard piped. I am going to bet it called for copper pipe and hard duct too, and those guys probably bid with PEX and flex duct.
My proposal with romex was $100k. The GC started grading the site this week. I’m afraid they are about to be in a world of doo doo.
Sent from my iPhone using Tapatalk
I asked for specs with the ITB, was told there were none. It’s a community center; wood framed, hard ceilings. I bid it with all NM cable and plastic boxes, and noted that in my proposal.
My fixture and gear submittals came back with a revise and resubmit stamp, and three pages worth of items they wanted submittals on. I called the PM this afternoon and asked if he was certain there wasn’t a specification binder. He said “oh yeh I forgot, there is one, the plumber and mechanical guys called today too asking about it.”
The specs called for the job to be hard piped. I am going to bet it called for copper pipe and hard duct too, and those guys probably bid with PEX and flex duct.
My proposal with romex was $100k. The GC started grading the site this week. I’m afraid they are about to be in a world of doo doo.
Sent from my iPhone using Tapatalk