buck33k
Senior Member
- Location
- Washington state and North Carolina
Can the GEC "taps" from multiple service panels to a full sized GEC go instead directly to the water pipe electrode or building steel and jumper from there to rods and concrete encased electrode?
Buck
edited to rephrase question.
[ April 20, 2005, 08:32 PM: Message edited by: buck33k ]
Buck
edited to rephrase question.
[ April 20, 2005, 08:32 PM: Message edited by: buck33k ]