johnny.lang0726
Member
- Location
- Arizona
- Occupation
- Solar technician/electrician
Would a GEC at the fused disconnect be required for a photovoltaic system if we are bonded at the fused disconnect? This would be for a supply side tap the fused disconnect would be our overcurrent protection device. And if it is required to have a separate GEC at the fused disconnect what code is it referencing?
Sent from my iPhone using Tapatalk
Sent from my iPhone using Tapatalk