There seems to be lots of debate on this subject and or ways of interpertation. If the first means of disconnect are at the panel, you are allowed to terminate the GEC in the panel. If the first means of disconnect are at the meter you are allowed to terminate the GEC in the meter can. Can the GEC from the ground rod terminate in the meter can AND panel and still be code compliant regardless of where the first means of disconnect are? I understand that the point of termination must be accessible, I am interperting that the meter can IS considered accessible.