sparks27
Member
- Location
- Portland, Oregon
I'm installing a new panel and i'd like to know if you agree here. i'm connecting the #4 bare to ground lug which is connected to service neutral at meter. i'm dropping down bottom of 1/2ko with romex clamp. thru wall below panel. exit hole in wall to ground rod w/clamp @ 1ft.from wall. I sleeved the gec with 1/2 emt.from ground rod to just inside the stucco wall.to protect from damage. other end of bare #4 goes to cold water pipe running thru top of panel (one of those pre punched 1/4 holes at top of panel) with clamp.