joeyww12000
Senior Member
- Location
- Chatsworth GA
250.64 (E), Heres what I saw at our job. A GEC coming out of a xfmr in FMC and changing over to PVC the rest of the way to the building steel termination. Wouldnt you at least bond the FMC to the xfmr case with a bonding bushing?