rojay
Senior Member
- Location
- Chicago,IL USA
Is it a violation of 310.10 (H)(3) to pull a GEC through only one service raceway where parallel conductors have been used and 2 service raceways have been installed?
I know the general rule of 310.10 doesn’t apply to grounding conductors, but what about the requirement of having the same number of conductors in a raceway?
I know the general rule of 310.10 doesn’t apply to grounding conductors, but what about the requirement of having the same number of conductors in a raceway?