DonaldSparkyDog
Member
On a project for the water co, the main service riser is rack mounted on a pole with an overhead drop. The 600a MDS is on the same rack. From there an UG feeder to the control bldg. switchgear contains the phase and the sized GEC for line side SI conductors instead of EGC sized for the 600a fuse. Does the NEC dis-allow this? The GE system is in the control building.