JasonCo
Senior Member
- Location
- Houston, Texas
Just wanted to shoot a quick question before work tomorrow. So I have a service lateral coming into a Trough. Here it taps into separately housed meters and service disconnects. Each meter enclosure is separately nippled from the gutter. Unfortunately the bottom knockouts of my meter enclosures are 2" and my nipples are 1.25". So I had to use reducers. I understand that in my service equipment one side of the nipple must be bonded per code anyways, so I'm just going to do the meter side b/c of the KO/reducers. Is it okay to daisy chain my bonding jumpers? So basically I have my neutral bonded to the gutter, and a GEC is sent to Earth. I'll then have ONE bonding jumper that goes through nipple one (meter 1), hits the bonding bushing. Then it goes back through the same nipple, then through nipple 2 (meter 2), bonds with bonding bushing and then daisy chains to the other meters using this method. Is this okay to do? I don't see why not, but maybe I'm missing a code or something, just want to make sure.