I have had two different inspectors require two different scenarios.
On a service we have the cold water ground and the two ground rods.
One says the CWG must be on the neutral and rods will go on the ground bar (both bonded together)
the other inspector insists on the rod Ground go on neutral and CWG on the ground bar.
Which is the code required method?
Can seem to find it in the book. (probably there , just can't find it)
On a service we have the cold water ground and the two ground rods.
One says the CWG must be on the neutral and rods will go on the ground bar (both bonded together)
the other inspector insists on the rod Ground go on neutral and CWG on the ground bar.
Which is the code required method?
Can seem to find it in the book. (probably there , just can't find it)