Just out of curiosity, On a multi-family house with two meters and two service panels, how would you terminate the gec from H2o and grd rods to the two tenant panels? I assume it is ok to terminate a gec to the neutral bar of panel #1 and run a jumper gec of same size to the neutral bar of panel #2 and terminate the H2o gec to the neutral bar of panel #2. I don't believe a gec from the grd rods and H2o line can be bonded together to a common point outside of the panels then to each panel. I'm just interested in how others would terminate the gec in this example. Thanks.