When installing outdoor service switches with indoor main lug panels . Can the GEC be ran in the same GRC and wireway with the feeders
The only available electrode being metal water piping system is in the same location where the panels will be located my goal is to minimize the amount of labor and material running an extra conduit for the gec. I suppose I can just mount it to the structure but I think that if I can use the same conduit as defeated it would be a little bit of a nicer job
Sent from my SM-S906U using Tapatalk
The only available electrode being metal water piping system is in the same location where the panels will be located my goal is to minimize the amount of labor and material running an extra conduit for the gec. I suppose I can just mount it to the structure but I think that if I can use the same conduit as defeated it would be a little bit of a nicer job
Sent from my SM-S906U using Tapatalk
Last edited: