typical 200amp resi
generator is a standard 8hp w/ L14-30 twist plug240/120 4-wire
If one is installing a generator subpanel next to the main panel,(with appropiate breaker interlocks) -
Would you splice each individual 12ga neutral in the main pain and bring each to the supanel neutral bar?
OR -
leave all of the neutrals in place on the main panel. and just splice the hot conductors in and out?
generator is a standard 8hp w/ L14-30 twist plug240/120 4-wire
If one is installing a generator subpanel next to the main panel,(with appropiate breaker interlocks) -
Would you splice each individual 12ga neutral in the main pain and bring each to the supanel neutral bar?
OR -
leave all of the neutrals in place on the main panel. and just splice the hot conductors in and out?