Hello. New to this forum. I'm a big 3 maintenance/construction electrician. A few questions on a installation I may be helping a friend with.
1) 3/0 copper for 200 amp portion?
2) #3 for 100 amp portion?
3) Since there are two panels downstream of the old main panel will I need to separate grounds and neutrals and remove any bonding screws in these downstream panels unless they already are? Will ground rods be required for these downstream panels if they don't exist?
4)I don't believe there are any ground rods for the current 200amp main panel. Should those be installed for the transfer switch as it will become the new main panel?
Thank you for any help. I've not dealt with this install being in a factory.
1) 3/0 copper for 200 amp portion?
2) #3 for 100 amp portion?
3) Since there are two panels downstream of the old main panel will I need to separate grounds and neutrals and remove any bonding screws in these downstream panels unless they already are? Will ground rods be required for these downstream panels if they don't exist?
4)I don't believe there are any ground rods for the current 200amp main panel. Should those be installed for the transfer switch as it will become the new main panel?
Thank you for any help. I've not dealt with this install being in a factory.