Has anyone seen the Generac Gemini system used in a mission critical application. Specifically looking at the 750kw (paralleled 375kw's) for use with an ambulatory care facility. I know only (1) of the (2) 375s will be up and transferred within the 10 second window, or at least only (1) is promised to be up. But I am just wondering how well they work, what maintainence is like with them and whether or not we shouldn't be pushing back on the owner to go with a different manufacturer for this application. Any experience/comments would be helpful, Thanks.
 