bcorps
Member
- Location
- Evansville, IN
- Occupation
- Engineer
I have a project where the main utility is coming into the building, and hitting a gutter on the inside of the exterior wall, from which 4 panels beneath it (all with main breakers) are fed. Nothing too exotic there. However, they want the entire building backed up by generator. My instinct is is that I can just intercept the feeder, and put a service-rated transfer switch ahead of the gutter. Does this transfer switch then effectively become the single service disconnect, allowing me to add as many panels as I need downstream, tapping the gutter feeder? (None of the existing panels is labeled as Service # of # currently, though if they would remain so, I will call for them to be labeled as such).