Tom Drake
Member
- Location
- West Palm Beach, FL
Can I install a non service rated ATS before the first means of disconnect? I have a 600amp service and installing a 100K Generator. Utility service is tapped in gutter after meter can and runs to three 200a MBO panels (first means of disconnect) in garage. Plan is to install three non-service rated 200a ATS's at meter location and leave existing MBO panels as is.