I've been installing a lot of generators recently. Usually the manual requires separate pipes for the control wires (dc) and the load wires (ac) unless the run is less than 30'.
The other day I installed one and the manual made no reference to the control wiring being in a separate pipe. I ran two pipes because that's what i usually do and i didn't have time to go through each page to make sure i wasn't missing something, but I'm not sure if i needed to.
Has anyone run into this? Has anyone run 1 pipe for everything?