Can a 1200A generator feed a 3000A transfer switch?
Normal feed is 3000A from the Utility, load is also 3000A.
I was told the NEC code doesn't restrict feeder sizing based on panel rating? Is that true and where in the code does it state that?
Normal feed is 3000A from the Utility, load is also 3000A.
I was told the NEC code doesn't restrict feeder sizing based on panel rating? Is that true and where in the code does it state that?