I got a 30 amp generator . What’s the difference if I install it to back feed my entire panel with the proper interlock switch then I’ll select what circuits I want on durning a power outage . Or install a 6-10 circuit transfer switch panel board and wire over preselected circuits during the install . What’s the advances to go with one of my options or the other ? Is one better than the other and are they both legal to do ?