I hope someone can help answer a Service Disconnect question. I have a police station with a 500 kw 277/480 3 Phase standby generator and Nema 3R ASCO ATS. The generator has a CB installed from the factory, the output conductors from the generator terminate on the emergency lug in the ATS. The intire building is on standby generator. The secondary side of the Utility transformer terminates in the ATS on the normal lugs, and then the load terminates in a switch gear main CB. The first OCPD is in the electrical room in the switch gear. Is there a requirement to have a service disconnect/ OCPD before the utility terminates at the ATS? Would the ATS fall under ART 230.82 and be consitered a tap on the supply side of the service disconnect?
Thanks for your help