I am wiring a 3 phase GENSET through a Transfer switch. The utility power comes to the other end of the transfer switch. The utility feed is 3 phases, 3 wire, 480VAC. The loads are all 3 phases motor loads. No single phase loads.
QUESTION: Do I need to ground the neutral of the GENSET. ? Since the utility is running ungrounded, can I run the generator ungrounded ?
It makes no sense to have 2 different systems, one with the utility system ungrounded and the other GENSET system grounded.
The code says that if you have single phase loads, you must have the neutral grounded.
Also this installation is not in public area and is accessable only to qualified electricians.
QUESTION: Do I need to ground the neutral of the GENSET. ? Since the utility is running ungrounded, can I run the generator ungrounded ?
It makes no sense to have 2 different systems, one with the utility system ungrounded and the other GENSET system grounded.
The code says that if you have single phase loads, you must have the neutral grounded.
Also this installation is not in public area and is accessable only to qualified electricians.