telak engineer
Member
- Location
- Alaska
I have a contractor placing a remote site on generator power until utility power can be placed. My general practice is to wait until the electric utility gets there service before placing Comm so I can bond to the MGN. Does anyone know if there is a code pertaining to this or what potential hazards placing facilities to this site would be.