generators

Status
Not open for further replies.

john coakley

Member
Location
fl
I need to get some advice on wiring panels to transfer switches to generator....i an installing an 80 kw with a 600 amp service...i am not sure of the proper way to set this up....i plan on putting a troff on top and one underneath...i just don't know what the code requires...as this is my first venture into this area....would appreciate any help i can get in this area...or even a web site showing to help me...
 

360Youth

Senior Member
Location
Newport, NC
Way too many possiblities with seeing what you are talking about. Is this existing service or prep for new? I just laid conduits in ground, for a home getting ready to go up, for CT to ATS runs and ATS to generator run. 600a service and ATS with 70kw gen. No trophs in these install plans, but we've done them. All depends on the layout.
 

john coakley

Member
Location
fl
Thank u for your reply....it is a new service....i plan on putting up meterbase,followed by panel,transfer switch x3...planned on using troff above to feed panels..and one on bottom to feed generator,from transfer switches.....thank you for any input......:
 

Aeti

Member
what brand genset are you using? kind of hard without looking at your lay out. and to be honest unless you have control wiring going out to the genset a troff really isn't need, just come out of your main panel wit ha peice of greenfield or pipe into the ATS, come back out of the ATS out side to a disconnect then from the diconnect to the genset, and make sure you drive a ground rod as well and bond the case.
 