I have been hired to check the electrical drawings developed by somebody else...I am trying to figure where the line is between being conscious and being a pain in the neck.
For instance if you find a conduit filled at 42, 43, or 45% in a 40% allowable fill, would you ask the designer to change it?

	
		
			
		
		
	
				