Here is the deal. 1200 amp main with 8 200amp module meter sockets. What should the ground be? Reading the code book is confusing. One area it states size to 250.66. Then somewher else it states the groung does not need to be any larger than 6ga. There is a grounding point in the disconnect, in each meter socket, the building needs to be grounded. What is the deal?