Note that design is not permitted per the changes for the 2020 code. Each has to be in a separate compartment.Yes. The mains in the meter stack render the inside panels sub-panels.
I have pics of a stack I did some time back; note the use of SER cable:
View attachment 2556677 View attachment 2556678 View attachment 2556679