busman
Senior Member
- Location
- Northern Virginia
- Occupation
- Master Electrician / Electrical Engineer
I don't do a lot of commercial work, so just wanted to double check.
Service is 800A 208/120Y. One circuit breaker in this panel feeds a 225A subpanel adjacent to it connected by 2-1/2" GRC. Is it acceptable to drill and tap the tub of the 225A panel for a ground bar and the GRC is the EGC back to the 800A panel? 99% sure this is correct, but always want to be sure.
Thanks,
Mark
Service is 800A 208/120Y. One circuit breaker in this panel feeds a 225A subpanel adjacent to it connected by 2-1/2" GRC. Is it acceptable to drill and tap the tub of the 225A panel for a ground bar and the GRC is the EGC back to the 800A panel? 99% sure this is correct, but always want to be sure.
Thanks,
Mark