Ground bushings

Status
Not open for further replies.

DCFIT

Member
Im running EMT From Main PNL to a Disconnect then connecting a Meter also an Inverter for Solar power. Code is different in Califonia then Las Vegas. In cali they require a gnd bushing on both ends of conduit run between all devices im installing. whats code ? I was under the impression that gnd bushings are needed on service devices only where knock out rings are located upon your connection.
 