I have seen the results of a drilling rig that bore holes in the ground and by chance hit underground feeders , we know that engineering should prevent things like that by having a survey completed before the work it started. [Poor planning]
My question would be should the drilling equipment be grounded ? This could be large portable equipment taken from site to site by truck.
It's possible to strike one phase first before contacting either the second phase or the egc , cables could be run in pvc conduit. 500amp <600v
Thanks for responses with this.