Another dump question: NEC article 517 application, if our main service protective device > 1,000A, code requires to have (2) levels of ground fault protection. So, if our main switchboard has a main 2,000A fused disconnect and all its first level downstream protective devices are also fused switches.
How are we going to provide ground fault protection for fused switches?
I always deal with Circuit breakers in main service entrance Switchboard but never think about fuses, (it's easy to specify electronic CB with L.S.I.G. features and comply with code), in case the client wants to use fuses instead of CB? Thanks!
How are we going to provide ground fault protection for fused switches?
I always deal with Circuit breakers in main service entrance Switchboard but never think about fuses, (it's easy to specify electronic CB with L.S.I.G. features and comply with code), in case the client wants to use fuses instead of CB? Thanks!