Cris Lima
Member
- Location
- Saudi Arabia
- Occupation
- Civil QA/QC
Good day to everyone. I would like to ask any information if a bedrock is encountered during trench excavation for the grounding loop, is the 30 inches minimum depth can be reduced? Thanks!