I'm maintenance man in the building. It never fails when contractors come, they do short cuts to save time.
We had old ground path lights. They de installed them and install new path ballard lights. The problem I have that new location of the lights are different and old splices are buried under ground without any water tight connectors.
1 or 2 years down the road I have to look for multiple boxes in the ground. As my understanding new PVC pipe should of been installed between those lights or UF and only splices should be inside of them lights.
Am I too picky on this matter? Should this be a code violation in NEC?
We had old ground path lights. They de installed them and install new path ballard lights. The problem I have that new location of the lights are different and old splices are buried under ground without any water tight connectors.
1 or 2 years down the road I have to look for multiple boxes in the ground. As my understanding new PVC pipe should of been installed between those lights or UF and only splices should be inside of them lights.
Am I too picky on this matter? Should this be a code violation in NEC?