Pouring a 6" pad for a hot tub. Local inspector requiring a ground loop. not using mesh for the pad. Not clear from the code: is the loop just a perimeter wire laid in the concrete and clamped together; or should it be exposed above the concrete and grounded to the lug on tub.
Just looking for specific reference guide in code not advice.